Tesoro Refinery Turnaround
Provided crane and heavy haul services for Tesoro at their Kenai refinery. They shut their facility to perform large scale maintenance and upgrades to the existing processing units. Cruz had a total of six cranes onsite for support, which included five 65-75 ton rough terrain cranes and one 230 ton lattice crawler.
KPL Blocked Crude Pile Installation
Installed 70 various diameter (8-12”) piling at Marathon’s KPL facility in Kenai. The piling were driven for foundations so Marathon could install cable trays, flow meters, and control valves which were all a part of the VSM for their tank farms.
Hansen Production Facility
Provided crane and heavy haul services for Tesoro at their Kenai refinery. They shut their facility to perform large scale maintenance and upgrades to the existing processing units. Cruz had a total of six cranes onsite for support, which included five 65-75 ton rough terrain cranes and one 230 ton lattice crawler.