Client
Emerald House
Date
December, 2021-April, 2022
Cost
$16,900,000
About
Emerald House’s Peregrine Exploration Program included drill exploration approximately 110 miles southwest of Deadhorse. This work included 98 miles of snow trail, 10 miles of ice road, a 2,000 foot ice runway, and drilling ice pads. Cruz provided full remote camp/office facilities as well as overland transportation of all drill rig components and materials to the well location. We transported all material and equipment for the conductor and cellar installs and supported these operations with a loader, cement truck, and roustabouts. A drilling and rig support crew of one loader and two roustabouts assisted the drilling contractor and pad foreman with all drilling support and pad logistics on a 24 hour basis.